| Material | Cost/sqft | Lifespan | Notes |
|---|---|---|---|
| Vinyl | $5-$10/sqft | 30-40 yrs | Cheapest |
| Fiber cement | $8-$16/sqft | 50+ yrs | Best value |
| Wood | $10-$20/sqft | 20-40 yrs | Classic look |
| Eng. wood | $8-$14/sqft | 30-50 yrs | Low maint. |
| Metal | $10-$20/sqft | 50+ yrs | Modern |
Compare local siding contractors
| Material | Per Sq Ft (installed) | 1,500 Sq Ft Home | Lifespan |
|---|---|---|---|
| Vinyl | $3–$8 | $4,500–$12,000 | 20–40 years |
| Fiber cement (HardiePlank) | $6–$13 | $9,000–$19,500 | 30–50 years |
| Engineered wood (LP SmartSide) | $5–$10 | $7,500–$15,000 | 25–40 years |
| Cedar wood | $8–$14 | $12,000–$21,000 | 20–40 years |
| Stucco | $6–$12 | $9,000–$18,000 | 50–80 years |
| Stone veneer | $15–$30 | $22,500–$45,000 | 50–100 years |
| Brick | $10–$20 | $15,000–$30,000 | 100+ years |
Fiber cement (James Hardie) has become the most popular premium siding choice because it resists rot, insects, and fire while mimicking the look of wood. It costs 30–60% more than vinyl but lasts significantly longer and has a much higher-end appearance that adds real curb appeal and resale value. Timing matters: scheduling during off-peak seasons or weekdays often saves 10-20% compared to peak-demand periods. Scheduling during off-peak seasons or slower periods often saves 10-25% compared to peak-demand timing.
The cost of siding depends on several interconnected factors that can shift the final number significantly in either direction. Material quality is typically the largest variable — the gap between standard and premium options can double or triple the total project cost. Labor rates vary by region, with major metros running 30–50% higher than rural areas for identical work.
Project scope is the other major cost driver. What seems like a simple project can escalate quickly once walls are opened or existing conditions are revealed. This is why experienced contractors build contingency into their estimates, and why homeowners should too. The most common budget-breaker is changing the scope mid-project, which resets timelines and pricing.